Analisa Infrastruktur Desa Sukaci-Baros Dengan Metode Critical Path Method (CPM)

Journal Title: Jurnal Sistem dan Manajemen Industri - Year 2017, Vol 1, Issue 1

Abstract

CV. ABP a construction company worked in infrastructure building development for private and goverment. Now CV. ABP is handling infrastructure development project of the acropolitan area (Right Payment) Sukaci - Baros Village. This project has been late for 19 days from the dead line 126 days. Therefore the cost is getting higher. It’s happened because bad management is the problem source. Restoring the project time need to be focused on the cost and the due date based on the schedule. Scheduling evaluation using Critical Path Method (CPM) and Crashing to find optimal results using Critical Path Method (CPM) can be found the critical paths activity, there are ground digging , bopflang installation, stone installation, agregrate B agrgregation , aggregate A flatting, rigit bavement work, and refining, when the time suppression obtained optimal time results from 126 days to 92 days. It taken an alternative to the addition of working hours with duration 92 day after the crashing. Using two alternatives, additional working hours and the addition of workforce, obtaining the difference of extra hours of work cost Rp 80.128.125 and labourcost increase Rp 55.260 from the regular cost.

Authors and Affiliations

Ahmad Nalhadi, Nana Suntana

Keywords

Related Articles

Optimalisasi Proses Produksi Celana Panjang Melalui Pendekatan Six Sigma

PT. Tainan Enterprises Indonesia branch of Cianjur produce various kinds of garment products. One of the most widely product is trousers. The product are still many defects. This is showed from the number of defective pr...

IBM PENGELOLAAN DATA KEPENDUDUKAN KELURAHAN KROBOKAN SEMARANG

Population data management of Kelurahan Krobokan Semarang Semarang is still done manually. Manual management is vulnerable to problems. The data stored in document form has the potential for data loss, and damage. In add...

Implementasi Six Sigma untuk Perbaikan Produk Nickel Pig Iron

PT. INF is a steel mining company. It produce such as nickel pig iron. Nickel pig iron used raw materials stainless steel factory, nickel and steel mill rolls. The number of defective products for nickel pig iron in a fe...

Klasifikasi Atribut Pelayanan Mobile Banking dengan Kano Model Berdasarkan Dimensi E-Servqual

This study aims to determine the classification of mobile banking services that improve customer satisfaction based on the dimensions of E-Servqual using the Kano Model method. The classification is needed so that the ba...

Uji Kuat Tekan dan Daya Serap pada Batako dengan Menggunakan Metode Taguchi

The brick making process has two very critical characteristics / Critical To Quality (CTQ) , namely compressive strength and water absorption. For the quality characteristics of the compressive strength the greater the v...

Download PDF file
  • EP ID EP246350
  • DOI -
  • Views 151
  • Downloads 0

How To Cite

Ahmad Nalhadi, Nana Suntana (2017). Analisa Infrastruktur Desa Sukaci-Baros Dengan Metode Critical Path Method (CPM). Jurnal Sistem dan Manajemen Industri, 1(1), 35-42. https://www.europub.co.uk/articles/-A-246350