Calculating the Groundwork Volume for the Construction of Logging Roads

Journal Title: Lesnoy Zhurnal (Russian Forestry Journal) - Year 2022, Vol 16, Issue 4

Abstract

Organizational and engineering models provide a formalized description of the construction process, including a list of operations, their sequence, description of the relationship between the operations, and the features of the work technology. Network models have the most complete mathematical description. However, a number of authors in their works point to serious shortcomings inherent in the network modeling of construction flow. The network model allows displaying accurately enough only the relationship of specialized traffic flows when the object is divided into sections equal in size to interchangeable grips. Such schedules are quite effective in planning and operational management of road works in a short planning period (decade or month). The adequacy of the real construction representation is violated when the network model is enlarged for long-term planning of the flow. The currently developed so-called generalized network models achieve process combination and continuity by introducing links between the operations, characterized by temporal parameters assuming any values, including negative values. However, the complexity of the mathematical description of these models still prevents their use in solving optimization problems. The research aims at developing a mathematical model and an algorithm for calculating the operational control of the groundwork volume during the construction of logging roads. A model of a complex object flow is proposed, where the flow operation time has a discrete nature. This condition is realized in the model by dividing the planned operation period of a complex flow into equal time intervals – scheduling intervals. The below described model of complex road construction flow can be presented on the basis of the scheduling task classification scheme and the analysis of existing economic and mathematical models and methods. The scheduling model developed for the purpose of determining the optimal groundwork for the road construction elements is a deterministic (at the 1st stage), discrete in time, engineering model with variable speeds of operations.

Authors and Affiliations

Maksim V. Matsnev, Natalia G. Ponomareva, Oleg N. Tveritnev, Petr V. Tikhomirov, Dmitry M. Levushkin, Andrei N. Briukhovetskii

Keywords

Related Articles

Improving the Stability of Wood-Cutting Saws by Thermoplastic Action on the Distribution of Residual Stresses in the Blade

The saw stability in operation defines the ability of the saw blade to resist the forces acting on it in the plane of greatest rigidity. The saw can work reliably only in case of maintaining stable balance, which is achi...

Seasonal Growth of Scots Pine under the Conditions of Water-Logged Soils of the North

The seasonal rhythm of height growth of young shoots of Scots pine growing in a 33-year-old shrubby-sphagnum pine forest of the northern taiga natural-climatic zone has been studied in a complex with the main physiologic...

Cultivating Siberian Stone Pine Plantations under Wild Animal Damage Conditions

The research of 26-year-old mixed plantations of Siberian spruce and Siberian stone pine cultivated by biogroups of about 300 pcs/ha (2–5 stone pine seedlings alternating 4–9 spruce seedlings in a row) has shown that...

Evaluation of Ecological Plasticity аnd Stability of Some Promising Varieties of Poplars

When developing promising assortments of forest woody plants, it is important to take into account not only their growth and survival in some particular environment, but also their respond to change in growing conditions...

A Variety or a Separate Species?

Curly (Karelian) birch is a unique and highly valuable representative of woody flora, whose natural growth has been preserved only in the north-west of continental Europe. The article recapitulates the development of vie...

Download PDF file
  • EP ID EP706819
  • DOI 10.37482/0536-1036-2022-4-156-172
  • Views 66
  • Downloads 0

How To Cite

Maksim V. Matsnev, Natalia G. Ponomareva, Oleg N. Tveritnev, Petr V. Tikhomirov, Dmitry M. Levushkin, Andrei N. Briukhovetskii (2022). Calculating the Groundwork Volume for the Construction of Logging Roads. Lesnoy Zhurnal (Russian Forestry Journal), 16(4), -. https://www.europub.co.uk/articles/-A-706819