Calculation Method and Application of Overhead Jumper Cable Length for Articulated Vehicles Based on the Catenary Equation
Journal Title: Urban Mass Transit - Year 2025, Vol 28, Issue 4
Abstract
[Objective] The selection of the overhead JCL (jumper cable length) for multi-marshaling urban rail transit vehicles is both complex and important. It is necessary to study the calculation method of the overhead JCL for articulated vehicles based on the catenary equation, in order to improve the calculation simplicity and accuracy. [Method] The principles and process involved in the calculation method of the overhead JCL for articulated vehicles based on the catenary equation are elaborated in detail; on this basis, a height calculation method of the mounting bracket installed overhead for cable crossing is proposed. In order to improve the application convenience of the method, a calculation software based on it is developed. The feasibility of the method and the software is verified in actual projects. [Result & Conclusion] State of the jumper cable is simulated based on catenary equation. According to the constant center distance between adjacent bogies of the articulated vehicle running along the track, the catenary equation under the limit condition is determined with reference to the minimum curve radius that the vehicle can pass through, and then JCL is calculated. The minimum JCL value is also obtained based on this. Taking into account the cable′s minimum bending radius requirement, the maximum JCL value is also obtained. The final length selection is basically to fall within this range. After determining the cable length, the height of the jumper cable′s lowest point from the installation plane can be obtained according to the catenary equation, thereby the bracket height can be obtained. The feasibility of the method is verified by actual project application effect.
Authors and Affiliations
Biyang CHEN, Jun WU, Tong LIU
Constitutive Model and Experimental Study of Stud Steel-Shotcrete Interface Bond-Slip in Mining Method Tunnel Initial Support
Objective It is aimed to elucidate the constitutive relationship of bond-slip at the interface between stud steel and shotcrete in the initial support of mining method tunnel. Method Four different working conditions are...
Research on the Settlement Law of the Ground and Existing Stations in the Close Under-crossing Construction of Subway Station
Objective As the development and utilization of urban underground space advances towards the three-dimensional and multi-dimensional direction, there are more and more over-crossing and under-crossing urban rail transit...
Reflection from Zhengzhou ′7·20′ Rainstorm towards Personnel Evacuation Platform Renovation Design in Metro Sections
Objective In recent years, extreme weather events and natural disasters increase and intensify frequently, and rainstorm-induced disasters in built urban rail transit and on-going foundation pit projects are causing sign...
Research on Accessibility Evaluation Method for Urban Rail Transit Station Based on Shared Bicycle Connection
[Objective] The shared bicycle is an effective connection tool for urban rail transit station. It is necessary to establish an accessibility measurement model to evaluate the accessibility of urban rail transit stations...
Shanghai Rail Transit Integration Development Strategy Based on Yangtze River Delta Integration
[Objective] With the deepening integration of regional development, it is essential to enhance the service level of urban rail transit, alleviate transportation pressure, and integrate regional resources. To achieve inte...