Common Factors of Cost Escalation in Construction Industry of Pakistan

Journal Title: Engineering, Technology & Applied Science Research - Year 2018, Vol 8, Issue 6

Abstract

Cost escalation is a ubiquitous problem, especially in Government organizations. Though bigger projects encompass escalation cost, in smaller projects, it is generally ignored. Several internal and external factors are responsible for the undesirably increased cost of a project. Among them some are tangible, and some are intangible. The scope of this study is to highlight most common remittable and non-remittable factors responsible for cost escalations. Thirty most common factors responsible were listed. A survey was done in order to have the stakeholder’s opinion on identifying the most common factors. Out of 102 generally identified escalating factors, 30 factors were shortlisted based on literature and initial study. Participants responded on a 1 to 5 Likert’s scale. Out of 200 distributed questionnaires, 52 reliable set of questionnaires were selected for data analysis. Clients, consultants, and constructors were selected from different projects like roads, structure, public amenities etc. Minimum threshold to participate in the survey was that a respondent must had at least a Diploma or Bachelor’s degree in the field of civil engineering. Results highlighted that financial problems, slow payments, and inflation are the top-ranked identified factors responsible for cost escalation in the construction industry of Pakistan. The weighted average of all factors ranges between 0.355 and 0.688, having 0.668, 0.629 and 0.625 for the top three factors.

Authors and Affiliations

S. Ahmed, A. H. Memon, N. A. Memon, A. N. Laghari, M. A. Akhund, H. U. Imad

Keywords

Related Articles

Design of a Self-Phased Quadrifilar Helix Antenna for Satellite Communication

The objective of this study is the design and implementation of a Quadrifilar Helix Antenna (QHA) for telemetry, tracking and control of a Low Earth Orbit (LEO) satellite. Because of its cardioid-shaped circularly polari...

A Gain Programmable Analog Divider Circuit Based on a Data Converter

Analog dividers are widely used in analog systems. Analog realization of such circuits suffer from limited dynamic range and non-linearity issues, therefore, extra circuitry should be required to compensate these types o...

Variable Speed Limits: Strategies to Improve Safety and Traffic Parameters for a Bottleneck

The primary purpose of the speed limit system is to enforce reasonable and safe speed. To reduce secondary problems such as accidents and queuing, Variable Speed Limits (VSL) has been suggested. In this paper VSL is used...

Optimal Placement and Sizing of Fault Current Limiters in Distributed Generation Systems Using a Hybrid Genetic Algorithm

Distributed Generation (DG) connection in a power system tends to increase the short circuit level in the entire system which, in turn, could eliminate the protection coordination between the existing relays. Fault Curre...

A Simple Measuring Model for Evaluating the Performance of Small Block Size Accesses in Lustre File System

Storage performance is one of the vital characteristics of a big data environment. Data throughput can be increased to some extent using storage virtualization and parallel data paths. Technology has enhanced the various...

Download PDF file
  • EP ID EP283563
  • DOI -
  • Views 284
  • Downloads 0

How To Cite

S. Ahmed, A. H. Memon, N. A. Memon, A. N. Laghari, M. A. Akhund, H. U. Imad (2018). Common Factors of Cost Escalation in Construction Industry of Pakistan. Engineering, Technology & Applied Science Research, 8(6), -. https://www.europub.co.uk/articles/-A-283563