Abstract

[Objective] In order to reduce the purchase cost and operation and maintenance cost of urban rail transit vehicles as much as possible, balanced maintenance system is adopted in some cities in China. Therefore, it is necessary to make comparative analysis on the balanced maintenance system and the traditional scheduled maintenance system. [Method] With the urban rail transit in Chongqing as an example, the maintenance process and maintenance cycle under two maintenance systems are introduced respectively, and the vehicle online rate and maintenance position amount under two maintenance systems are compared and analyzed. [Result & Conclusion] Compared with the traditional scheduled maintenance system, the annual detention time of each train under the balanced maintenance system is reduced by 19 days, and the number of required maintenance position is increased by 18.5%. The result shows that the balanced maintenance system for urban rail transit vehicles is more reasonable.

Authors and Affiliations

Tao HUANG, Zhengyuan ZHANG, Shixi SHI

Keywords

Related Articles

Quantitative Analysis and Allocation of Safety Integrity Level Indexes for Urban Rail Transit Vehicle System

Objective Development and application of FAO (fully automatic operation)system in urban rail transit train requires higher safety of urban rail vehicle system. Under the new operation scenario where FAO needs to be confi...

Load Characteristics of B-type Metro Vehicle Bogie Frame

Objective The international standards adopted in metro vehicle design and verification in China do not fully align with the actual vehicle operating conditions, resulting in the phenomenon of fatigue cracks in some metro...

Cause Analysis of Seepage Disaster in Deep Foundation Pit of Metro Station in Karst Stratum

Objective In-depth study should be made on the seepage stability during deep foundation pit excavation in water-rich karst stratum in consideration of the water inrush disaster at the side wall or bottom of the pit durin...

Deformation Control for Foundation Pit Segmented Construction Adjacent to Operational High-speed Railway Lines

Objective Limited land use resource and arrangement adjacent to operational high-speed railway lines pose significant challenges to some city foundation pit constructions and the railway operational safety. To reasonably...

Control Algorithm of Train Autonomous Control System in Turnout Safety Zones

[Objective] Unlike the existing CBTC (communication-based train control) system control mechanism, the ATC (autonomous train control) system achieves autonomous train operation by directly controlling wayside resources....

Download PDF file
  • EP ID EP732813
  • DOI 10.16037/j.1007-869x.2024.03.039
  • Views 43
  • Downloads 0

How To Cite

Tao HUANG, Zhengyuan ZHANG, Shixi SHI (2024). Comparative Analysis of Balanced Maintenance System and Scheduled Maintenance System for Urban Rail Transit Vehicle. Urban Mass Transit, 27(3), -. https://www.europub.co.uk/articles/-A-732813