Comparative Study Of Pre-Planning And Actual Planning Process In Construction Industries

Abstract

Any project that is going to be involved in construction industry must start with the general planning before engaging with the contractors. Planning is defined as the process of developing the project plan. Planning outlines how the project is to be done by specifying some pre-determined and committed future course of action to achieve its goal. Generally planning is of two types namely Pre-planning and Actual planning. Pre-planning summarizes the detailed information about productivities and work volumes in building construction. Actual planning is any changes in the on-going process due to the above said factors are rectified. This study aims at collection of data regarding Pre- planning and Actual planning. A comparative study is to be done about the failures and drawbacks of the Pre-planning and success of the Actual planning using Microsoft Project.

Authors and Affiliations

B. Annalakshmi

Keywords

Related Articles

Prediction of Flow Regimes and Bedform Migration

Regime of flow and migration rate is an important factor to estimate the rate of sediment transport and identify the various shape of bed form geometry in natural Channels. It is also observed that as sediment transport...

Migrant Labourers and their Health & Hygiene

In this research article, the writer has attempted to talk about the issues identifying with health and hygiene of migrant labourers. Since ages, the migratory working procedure is extremely widespread in India that offe...

Descriptive Study of Road Traffic Accidents in Kashmir

Accidents, tragically, are not often due to ignorance, butare due to carelessness, thoughtlessness and over confidence. Human, vehicle and environmental factors play roles before, during and after a trauma event. Acciden...

Virtual Servers Allocated Dynamically With Support of Dps for Saving Energy and Reducing Operational Cost

Cloud computing is a model for delivering services in which resources are retrieved from the internet through web-based tools and applications, rather than a direct connection to a server. Data is stored in servers. Clou...

Evaluation of Compressive Strength and Water Absorption of Styrene Butadiene Rubber (SBR) Latex Modified Concrete

In this research, effect of Styrene-Butadiene Rubber (SBR) latex on water absorption and compressive strength of concrete has been studied. A locally available “RIPSTAR-148” is used as SBR Latex. It has been observed tha...

Download PDF file
  • EP ID EP220205
  • DOI -
  • Views 175
  • Downloads 0

How To Cite

B. Annalakshmi (2014). Comparative Study Of Pre-Planning And Actual Planning Process In Construction Industries. International journal of Emerging Trends in Science and Technology, 1(2), 117-120. https://www.europub.co.uk/articles/-A-220205