Comprehensive Construction Method for Shield Receiving in Water-rich Silty Sand Stratum
Journal Title: Urban Mass Transit - Year 2024, Vol 27, Issue 12
Abstract
[Objective] To address the issue of cutterhead damage and subsequent work stoppages caused by unidentified obstructions during the construction of Zhengzhou Metro Line 3 tunnel, it is essential to study comprehensive construction methods for shield receiving in water-rich silty sand stratum. [Method] A comprehensive construction plan for shield receiving is introduced, incorporating techniques such as the double-ring freezing method, active dewatering, mining methods, and shield empty push construction. The temperature variation characteristics of freezing and key construction technologies are analyzed using on-site monitoring data. [Result & Conclusion] The comprehensive construction plan is proven to be safe and effective for dealing with shield receiving in water-rich silty sand stratum conditions. Adopting double-ring freezing method combined with active dewatering could effectively prevent issues related to water and sand inflows in mining method tunnels. During the steam thawing process of the inner ring freezing wall, the temperature of the outer ring freezing wall increases by approximately 5 ℃. When employing the shield empty push method through a mining method tunnel that is not fully thawed, the maximum shield thrust is 26 500 kN, which is less than the theoretical value of shield push resistance. At this point, the ground displacement and tunnel deformation all meet control requirements. During shield empty pushing, the temperature at the interface between shield casing and partially thawed inner ring soil remains around 3 ℃. When crossing the frozen zone using the mining method, different levels of land subsidence are observed near the tunnel, while the soil layer subsidence trend far away from the tunnel remains relatively stable.
Authors and Affiliations
Yubing CHEN, Zhihe LIU, Fangqi XIAO, Wei LIU, Nianwu LIU, Xiaolu GAN, Shenghan CHEN
Sensitivity Analysis and Optimization Design of Brake System Pipeline Clamp Positions
Objective During the design phase of brake system pipeline for rail vehicles, optimizing the support positions of clamps can effectively avoid the excitation frequency of the vehicle carbody and reduce the risk of pipeli...
New Measurement Methods for Transition Resistance of Rail Tracks in Urban Rail Transit
[Objective] To analyze the impact of stray currents on buried pipelines and electrical equipment during metro operation, it is necessary to study new measurement methods for the transition resistance of rail tracks in ur...
Types and Implementation Key Points of Expansion and Renovation for Urban Rail Transit Existing Lines
[Objective] At present, some urban rail transit lines face significant mismatches between passenger flow demands and capacity supply. Capacity expansion and renovation is the common approach to enhance line transportat...
Influence of Movable Bearing Friction Resistance on CWR of Subway Continuous Beam Bridge
[Objective] When continuous beams are employed in subway bridges, frictional resistance exists at the movable bearings, which may affect the force and deformation of the continuous welded rail (CWR) on the bridge. Ther...
Design and Construction Optimization for Elevated Long-link Seamless Urban Rail Transit Station with Bridge-building Unified Structure
[Objective] The elevated long-link seamless station with bridge-building unified structure integrates building and bridge and enables the station pier column to have stiffness requirements while possessing the characteri...