Construction Optimization of Shallow Railway Tunnels under Unsymmetrical Pressure for Reducing Blasting Over-excavation
Journal Title: Urban Mass Transit - Year 2024, Vol 27, Issue 6
Abstract
Objective Over-excavation in tunnel construction, mainly caused by inappropriate blasting,will affect the smooth progress and safety of tunnel excavation, increase construction cost and reduce economic benefits. In order to radically solve this problem, blasting design and blasting construction technology should be studied and optimized. Method Based on the shallow buried unsymmetrical pressured layered railway tunnel project for Chongqing Railway Hub East Ring Line(Chongqing East Ring Railway),the causes of vault, arch haunch and arch foot over-excavation are analyzed with theoretical method and modern computer technology. The drilling positions are designed with dynamic optimization, and control measures and solutions for over-excavation are put forward. Result & Conclusion Over-excavation at the tunnel vault is mainly caused by the secondary disturbance of the surrounding rock in smashed area by mechanical excavation after blasting, and over-excavation at the arch waist and arch foot is mainly caused by the improper amount of blasting explosive and improper drilling. In addition, the existence of rock cracks will also lead to significant decrease of the surrounding rock strength. Therefore, proper blasting and under-excavation should be done at the vault to reduce the disturbance of the surrounding rock, and then manual + mechanical excavation and trimming should be combined to reduce the amount of over-excavation. Secondly, according to the attributes of surrounding rock, and based on GA-SVR model and genetic algorithm, the blasthole spacing is properly optimized. On-site monitoring results show that in the initial stage without optimized blasthole spacing, the over-excavation in cracked stratum is about 40cm, which is reduced to about 9cm after the blasthole spacing optimization. The results indicate that optimizing the blasthole spacing can effectively control tunnel over-excavation. The above results can provide reference for similar projects.
Authors and Affiliations
Fengjie YUAN, Haoqian WANG, Guanping SONG, Lang YUAN, Hang GAO, Qianwei XU
Simulation Research on Temperature Control of Metro Underground Substation Main Transformer Room
Objective Huge heat is generated during underground substation transformer operation. Failure to promptly dissipate this heat can lead to problems such as transformer overheating, equipment malfunctions, and even fire ac...
Urban Rail Transit Regional Collaborative Management Mode Based on Shanghai Resilient City Construction
Objective The regional collaborative management of urban rail transit (URT) is explored to assist in the construction of Shanghai resilient city. Research is carried out specifically on the collaborative management mode...
Research on Circumferential Deformation of Metro Shield Tunnel Based on FBG Monitoring Technology
Objective FBG (fiber bragg grating) monitoring technology features fast dynamic response, strong anti-interference, high precision and strong durability, and can realize long-distance real-time monitoring. The feedback c...
Analysis and Solution Schemes for Interference on Metro Signaling System Axle Counting Equipment
[Objective] During the system commissioning, train debugging and trial operation on Chengdu Metro Line 18, the axle counting equipment exhibits AIO (abnormal interference and occupation) due to various disturbances in di...
Lightning Test and Simulation Research for Medium-speed Maglev Train
Objective When medium-speed maglev trains operate on elevated tracks, the carbody is susceptible to lightning strikes. If composite materials are adopted for medium-speed maglev train carbody, damage or even penetration...