Delay analysis of multihop wireless ad hoc network using queuing network model

Journal Title: INTERNATIONAL JOURNAL OF COMPUTERS & TECHNOLOGY - Year 2013, Vol 10, Issue 4

Abstract

Ad hoc wireless network is a self configurable infrastructure less network. The lack of infrastructure support in ad hoc networks makes them useful in various applications such as at the disaster site, highway, vast forest, battle field, oceans, etc. Since there is no centralized control in ad hoc network, each node can act as a source, a destination or a router. Ad hoc wireless networks therefore, experience congestion more than the wired networks, leading to jitter and high end to end delays even for moderate traffic which may lead to performance degradation. So it is crucial to analyze the factors which affect the capacity and end-to-end delay in wireless ad-hoc networks. In this paper a G/G/1queuing network model is proposed togain insights into the end-to-end delay in a multi hop wireless ad hoc networks. Queuing network model is unique as it providesclosed form expressions for average end-to-end delay in multihop wireless ad hoc networks. NS2 simulation is conducted in order to verify  and compare the theoretical results.

Authors and Affiliations

Seema Kumari, Dr. M. U. Kharat

Keywords

Related Articles

The Optimal q-Homotopy Analysis Method (Oq-HAM)

In this paper, an optimal q-homotopy analysis method (Oq-HAM) is proposed. We present some examples to show the reliability and efficiency of the method. It is compared with the one-step optimal homotopy analysis method....

Implementation of Colored CAPTCHA

CAPTCHAs is an interesting of research are short forCompletely Automated Public Turing test to tell Computersand Humans Apart. The purpose of a CAPTCHA is to blockform submissions from spam bots –automated scripts that...

AN IMPROVED RESOURCE ALLOCATION STRATEGY BASED ON PACKAGE LEVEL ACCESS IN CLOUD ENVIRONMENT

Cloud computing is an emerging field of computer science, where heterogeneous services such as applications, servers and storage are delivered to an individual or organization's computer and devices through the Internet....

Multi-Agent System Overview: Architectural Designing using Practical Approach

A software agent should be autonomous, flexible, robust and social. The increasing importance of the Multi-Agent System (MAS) has led to the greater availability of tools designed to facilitate their creation and use. To...

P-Codec: Parallel Compressed File Decompression Algorithm for Hadoop

The increasing amount and size of data being handled by data analytic applications running on Hadoop has created a need for faster data processing. One of the effective methods for handling big data sizes is compression....

Download PDF file
  • EP ID EP650189
  • DOI 10.24297/ijct.v10i4.3250
  • Views 69
  • Downloads 0

How To Cite

Seema Kumari, Dr. M. U. Kharat (2013). Delay analysis of multihop wireless ad hoc network using queuing network model. INTERNATIONAL JOURNAL OF COMPUTERS & TECHNOLOGY, 10(4), 1503-1509. https://www.europub.co.uk/articles/-A-650189