Design Optimization of a Run-Of-River Small Hydropower Plant: A Case Study of Mabula Kapi Site

Journal Title: Engineering and Technology Journal - Year 2024, Vol 9, Issue 09

Abstract

Prior to construction, small or large hydropower plants undergo feasibility studies, which involve technical, economic, financial, social, and environmental aspects. Technical studies, particularly, include various engineering disciplines. This study sought to conduct a component of technical feasibility studies, focused on design optimization of the turbine-plant capacity size for a run-of-river case study called Mabula Kapi, on Kaombe River, Serenje, Zambia. The study method used computational modelling, simulation, and optimization techniques, and used secondary data from previous site. A prefeasibility study conducted earlier had underestimated the turbine-plant capacity owing to underestimated discharge data, owing to lack of site gauging station. A less accurate discharge estimation method involving transposition from a gauged similar catchment had been used. A later feasibility-level site hydrological study found improved discharge data. Riding on the improved discharge data, this study found the following optimised plant design parameters based on plant design discharge of 6.20 m3/s: Installed capacity of 10.20 MW; Annual energy production of 42 GWh; Capacity factor of 47.1%; 3 x Pelton wheel of 272 rpm speed, 2.1 m diameter, 2-nozzles of diameter 0.16 m each, 21 buckets of 0.58m width each; and 3 x 4 MVA generators of 50Hz, 22-poles, and 11kV.

Authors and Affiliations

Dean Lameck Musukwa , Dr. Edwin Luwaya,

Keywords

Related Articles

Application of Lean Methodology to Increase Productivity through Value Stream Mapping

Productivity plays a vital role for business because it controls the real income that is needed to meet obligations to customers, employees, shareholders, and government through taxes and still remain competitive in the...

Sentiment Analysis Techniques and Application-Survey and Taxonomy

Nowadays, social media platforms, blogs, and e-commerce are commonly use to express opinion on politics, movies, products, education respectively; for election forecasting, business boosting and improvement of teaching a...

REENTRY OF IONIZED SPACE DEBRIS BY ATMOSPHERIC LAYERS WITH VARIABLE DENSITY

The atmospheric re-entry of a space object (operational or not) is defined as its return to the surface of the planet. Space Debris can suffer a non-negligible action from atmospheric drag. These bodies tend to initiate...

Design and Construction of Gas Fire Alert System

This research paper aspired to design and develop a gas leakage and fire monitoring and detection alarm system based on SMS. Most fire incidents in houses, schools and factories are caused by gas leakage. Many houses and...

DYNAMIC RESOURCE ALLOCATION ALGORITHM FOR OFDM SYSTEMS (LTESTANDARD)

This paper proposes a resource allocation algorithm for MIMO-OFDM systems (LTE standard). The algorithm is developed for orthogonal frequency division multiple access (OFDMA) system with frequency hopping and adaptive su...

Download PDF file
  • EP ID EP743924
  • DOI 10.47191/etj/v9i09.08
  • Views 48
  • Downloads 0

How To Cite

Dean Lameck Musukwa, Dr. Edwin Luwaya, (2024). Design Optimization of a Run-Of-River Small Hydropower Plant: A Case Study of Mabula Kapi Site. Engineering and Technology Journal, 9(09), -. https://www.europub.co.uk/articles/-A-743924