Disturbance Deformation Influence and Field Measurement Study of Metro Shield Under-passing High Building Foundation
Journal Title: Urban Mass Transit - Year 2024, Vol 27, Issue 4
Abstract
Objective With an increasing number of cases involving metro shield tunneling through or in proximity to high buildings in urban rail transit projects, the shield tunneling method inevitably causes disturbances to the ground due to its unique construction process. In several cases, it may impact the structural safety of existing buildings. Therefore, an in-depth study of the force characteristics on both the tunnel and high buildings during shield tunneling is necessary. Method Leveraging the tunnel construction project of Shengchan Road Sta.-Lihuang Road Sta. interval on Jinan Metro Line R2, a 3D finite element numerical method is employed to simulate the construction process of double-line shield tunnels asynchronous oblique angle under-passing a group of high buildings with pile and raft foundations. Combining with field-monitored data, the law of ground displacement, deformation characteristics of building settlements, and the control effectiveness of shield tunneling parameters during construction are analyzed. Result & Conclusion When the double-line shield tunnels successively pass beneath the building pile group, the land subsidence caused by leading tunnel excavation is relatively significant, while the disturbance to the ground from subsequent tunnel excavation is relatively small. The maximum subsidence occurs when the shield tunnel is directly beneath the building, and as the shield tunnel moves away, the subsidence gradually decreases and tends to stabilize. Due to the framed structure of the high buildings, partial subsidence occurres on the building area adjacent to the tunnel side, while the part far away from tunnel exhibits an upheaving trend. However, the differences in subsidence amount between the two scenarios remain within a manageable range.
Authors and Affiliations
Kun ZHANG, Qianwei XU, Qingwen SUN, Hairu XUE, Shouxi LAI
Adjustment of Nantong Urban Rail Transit Network Planning after Introducing Important Regional Transportation Infrastructure
Objective Under the background of regional integration of Yangtze River Delta, the introduction of important regional transportation infrastructures such as the new airport (hub) station in Nantong will not only greatly...
Effectiveness Verification of Train Real-time Positioning Function Based on Speed Measuring Radar and Electronic Map under TACS
Objective At present, CBTC (communication based train control) precise train positioning technology is prone to high cost of engineering construction and reconstruction, positioning errors and etc. Therefore, it is neces...
Selection and Heat Dissipation Analysis of Regenerative Braking Energy Absorption Device in Urban Rail Transit Depot
[Objective] The regenerative braking energy absorption resistance in urban rail transit depot has a large heat dissipation. In order to effectively solve the problem, it is necessary to select the right type of regenerat...
Research on the Integrated Detection Host System of Urban Rail Transit Trains
[Objective] In order to ensure the safe operation of urban rail transit, meet the detection requirements of track obstacles and key components such as pantograph-catenary, running gear and track, and solve problems of...
Mapping Law of CRTS Ⅱ Type Slab Ballastless Track Static Deformation Due to Subgrade Horizontal Deformation
Objective Aiming at the insufficient control indexes for high-speed railway subgrade horizontal deformation currently, it is necessary to study the influence law and limit values of ballastless track subgrade horizontal...