Enhancing Assembly Line Efficiency Using RPW Method and Kw Method in Eicher Tractor Limited

Abstract

assembly lines are special flow lines production systems which are of great importance in industrial production of high quality standardized commodities. Assembly line balancing is a classic problem in any business. The line balancing problem is to arrange the individual processing and assembly task at the workstations, so that the total time required at each station should approximately same for smooth production flow. Assembly line balancing problem have been conventionally classified into two types that is type-1 focuses on minimizing the number of workstations for a given cycle time and type -2 is minimizing the cycle time for a fixed number of workstations. The present work study is based on comparative analysis of two heuristic methods for assembly line balancing problem. In the current case type -1 problem has been taken into consideration .a simulation software tecnomatix plant simulation is also used for simulation purpose. This software shows satisfactory result when run on the given data. The results show that by using the rpw method, there is a reduction in the number of workstations thereby reducing the requirement of human resources and improvement in line efficiency by increase in the throughput.

Authors and Affiliations

Mahendra Singh, Prof. (Dr. ) Archana Nema

Keywords

Related Articles

Determining and Analyzing Design Components to Increase Social Interactions Case Study: Sattarkhan Street, Shiraz

Lively cities need active social interactions, economic prosperity and businesses on thestreets and in business centers. Successful business needs potential customers. Increasing social interactions, economical trade an...

Establishment of Regenerative Callus, Cell Suspension System and Molecular Characterization of Stevia Rebaudiana Bertoni for the Production of Stevioside in In Vitro

An efficient and standardized medium for callus induction was developed using leaf explants cultured on MS medium supplemented with 1.0mgl-1 1-Naphthaleneacetic acid (NAA) and 1.0 mgl-1 2,4-dichlorophenoxyacetic acid (2...

Multipurpose Helmet used in Vehicle System

As our country is a developing country. Even though we are developing in our technology and research, the death rate in road accident are increased every year. In India we are losing life of people is of about 382 every...

Leaf Recognition Based on PHOG and COALBP Features

Leaf can be characterized by its color, texture, vein structure, and shape. The vein can be an important morphological characteristic of the leaf. Plants can be seen in different places, including roads, mountain paths,...

Boiler Tank Level Control Using Fuzzy Logic

In control systems there are a number of generic systems and methods which are encountered in all areas of industry and technology. From the dozens of ways to control any system, it turns out that fuzzy is often the ver...

Download PDF file
  • EP ID EP24629
  • DOI -
  • Views 283
  • Downloads 12

How To Cite

Mahendra Singh, Prof. (Dr. ) Archana Nema (2017). Enhancing Assembly Line Efficiency Using RPW Method and Kw Method in Eicher Tractor Limited. International Journal for Research in Applied Science and Engineering Technology (IJRASET), 5(6), -. https://www.europub.co.uk/articles/-A-24629