Experimental Investigation on Grouting Repair in Operational Shield Tunnels
Journal Title: Urban Mass Transit - Year 2024, Vol 27, Issue 7
Abstract
Objective After a significant cross-sectional deformation of shield tunnel structure, using internal tension steel ring reinforcement and the like will incur substantial material and labor costs. Improving the stress conditions of the shield tunnel structure and proactively correcting deformations through secondary grouting is a more economical approach. Therefore, it is necessary to conduct an in-depth study on the effectiveness of grouting repairing cross-sectional deformation in shield tunnel structure, as well as the structural response during and after grouting process. Method Field grouting tests are conducted in a shield tunnel of Wuhan Metro, peripheral strata defects, structural cracks, and convergence deformations before and after grouting are measured and compared. The law of tunnel structure convergence deformation and horizontal displacement changing over time after lateral grouting inside tunnel structure is analyzed in-depth. Result & Conclusion The test results demonstrate that the effectiveness of lateral grouting inside the tunnel in repairing ground defects, addressing tunnel structural cracks, and correcting significant cross-sectional deformations. The distribution pattern and time-history development of convergence deformations and horizontal translations of the lining ring under grouting load influence are revealed. During grouting process, the lining ring at the grouting point exhibit a ′vertical-ellipse′ deformation convergence trend. Approximately 2.5 hours after grouting, the lining structure exhibits some rebound in ′vertical-ellipse′ convergence deformation due to the grout shrinkage, and the deformation trend further continues. Around 20.0 hours post-grouting, the tunnel structure convergence deformation will be basically stabilized.
Authors and Affiliations
Yong WAN, Jinlong WANG, Fei TANG, Xuebing SUN, Yumeng ZHANG, Xingrui CAI, Xian LIU
Evacuation Solution for Fully Automatic Operation System of Urban Rail Transit
Objective In order to ensure that FAO (fully automatic operation system) can effectively guarantee the safe evacuation of passengers in case of emergency and quickly resume operations after evacuation completion, it is p...
Reasonable Energy Consumption Correction Method for Ventilation and Air-conditioning of Platform Screen Door Metro Stations in China
Objective In view of the continuous growth of energy consumption in metro stations, in order to accurately evaluate their current energy consumption level, tap energy conservation potential and promote energy conservatio...
Dynamic Response Simulation of the Pile-soil Composite Foundation and Adjacent Metro Tunnel under High-speed Train Load
Objective As a typical vibration load, the vibration load caused by high-speed train running will induce dynamic response of the pile-soil foundation and the adjacent structures. It is necessary to study the characterist...
Comparative Analysis of Calculated and Experimental Current Carrying Capacities of Rail Transit Aluminum Alloy Conductive Rails
Objective AAC (luminum alloy conductive) rails are widely used in rail transit power supply systems. However, a significant deviation often exists between the calculated and tested values of the permissible current carry...
Experimental Investigation on Grouting Repair in Operational Shield Tunnels
Objective After a significant cross-sectional deformation of shield tunnel structure, using internal tension steel ring reinforcement and the like will incur substantial material and labor costs. Improving the stress con...