Faktor-Faktor yang Mempengaruhi Contract Change Order pada Pekerjaan Rehabilitasi Jalan Mataiwoi-Abuki
Journal Title: Sultra Civil Engineering Journal - Year 2022, Vol 3, Issue 1
Abstract
The research was conducted using descriptive statistical methods, namely by analyzing data and questionnaires to determine the mean and then calculating the value of the Relative Interest Index (IKR). This analytical method will be very useful for identifying the rank of respondents and giving priority to study variables. The results showed that the factors causing CCO were the effect of cost (0.362) with a t count of 0.869. The dominant factors causing Contract Change Order (CCO) that affect cost and time are the contractor factor, then the influence of cost, natural conditions, planning & design, time, and the lowest one is the owner's influence.
Authors and Affiliations
Rajanun Rajanun, Irwan Lakawa, Sitti Hawa, Haryono Haryono, Sufrianto Sufrianto
Analysis of National Road Slope Risk Level Based on Geographic Information System
The purpose of this study is to investigate the failure and instability of slopes, control and evaluate treatments and create slope data in a geographic information system as a planning data base to determine the level o...
Cost analysis of Occupational Health And Safety (K3) on the Road Preservation (Case Study : Road In Kendari City – Kendari City Boundary)
The purpose of this study was to determine how much the application of K3 and to analyze the cost of K3 on the road preservation project within Kendari City - Kendari City boundary. The results showed that the level o...
Pengaruh Kebisingan Lalu Lintas Terhadap Ketergangguan Pegawai Kantor Bkd Provinsi Sulawesi Tenggara
Noise is unwanted sound, which can impair the health and comfort of the environment, have a source and propagates through a medium. Provincial Civil Service Agency of Southeast Sulawesi’s Office is located at the interse...
Korelasi Nilai CBR Dengan kepadatan Lapangan Subbase Course Studi Kasus: Ruas Jalan Tugu munajah Kabupaten Bombana
The durability of the road flexural pavement structure is largely determined by the performance of each layer. One of these factors is the strength and resilience of the subbase. Compaction in accordance with applicable...
Kajian Infrastruktur Transportasi Darat Dalam Pengembangan Wilayah Kecamatan Tongauna Kabupaten Konawe
The development of rural areas from the agricultural base sector in the field of food through land transportation infrastructure is the main focus of this research. The location of the object of research was Tongauna Dis...