Faktor- Faktor Yang Mempengaruhi Proses Pelaksanaan Pekerjaan Jalan Lingkar Kota Kendari II
Journal Title: Sultra Civil Engineering Journal - Year 2020, Vol 1, Issue 1
Abstract
Project delays can come from service providers or other users who have an impact on additional time and expenses beyond the plan. If the delay comes from the contractor (Contractor), the contractor may be fined, as well as if the delay arises from the user of the service, the service user shall pay the loss incurred by the service provider, the amount stipulated in the contract in accordance with applicable legislation. Many studies have been done to determine the factors that cause the delay in completion of the project. Budgeted Cost of Work Scheduled (BCWS), describes the budget plan to a certain period of volume of the project plan to be done. Budgeted Cost of Work Performed (BCWP), describes the project plan budget for a certain period of what has been done on the actual volume of work. Land acquisition is the work of Kendari II railway project, at the time of execution of work there is a name of compensation made from the government to the community, if there is a community land whose land is affected by the project. The availability of budget is Kendari II road project, with length 38.15 km with budget amount Rp. 2.607.981.000,00 this is very limited. So that the contractor to carry out the project work according to the existing volume. Geographical conditions of the work of Kendari II city circle project, there are drawings of plans and work items before carrying out a project work. This research concludes that factors influencing the completion of construction project of Kendari II ring road.In accordance with the calculation of SPSS program (factor analysis) of 3 factors that affect the process of execution road construction project in Kendari City. The 3 factors that are contribution value in detail are: 1) availability of budget with value 93,3%, 2) land acquisition with value 68,5% and 3) Geographical condition with value
Authors and Affiliations
La Madu, Sunaryo Sunaryo, Laoede Musa Rachmat
Modified Asphalt Mix Performance With The Addition Of Human Hair Waste
The development of road infrastructure in Indonesia is currently increasing, starting with new road construction projects to road improvement projects. To prevent premature damage to road pavements due to loading and the...
Faktor-Faktor Yang Mempengaruhi Mutu Pelaksanaan Proyek Peningkatan Jalan Tedubara-Pising Kabupaten Bombana
This study aims to analyze the factors that influence the quality of the implementation of improving the Tedubara-Pising street in Bombana Regency. This study uses quantitative data analysis techniques with a sample size...
Analysis of Construction Workers' Perceptions of Company Services (Case Study: PT. Konawe Multi Usaha)
In supporting the success of infrastructure development, it is necessary to have good cooperation between owners, contractors and workers which must be supported by the implementation of a project management system. A co...
Efektifitas Waktu Pelaksanaan Pekerjaan Rekonstruksi Jalan Wolo –Batas Kota Kolaka – Rate Rate
By analyzing the implementation of this project work is expected to know the comparison between the plan and the realization, the effectiveness of the time executor and factors affecting the effectiveness of implementati...
Model Hubungan Karakteristik Arus Lalu Lintas Pada Ruas Jalan Abdullah Silondae Kota Kendari
Abdullah Silondae Road is a type of 4 lane 2 undivided road (4/2 UD) which is a pathway to urban activities, education, trade and. The research objective is to model the relationship of traffic characteristic parameters...