Fault Diagnosis Method for Control Circuit of ZDJ9 Double-machine Traction Speed-up Turnout Electric Switch Machine
Journal Title: Urban Mass Transit - Year 2025, Vol 28, Issue 1
Abstract
[Objective] In the ZDJ9 double-machine traction speed-up turnout electric switch control circuit, 1DQJ is an instantaneous suction relay. When the outdoor switch circuit does not form a loop, that is, in the event of a fault, the 1DQJ relay only maintains a short-term suction state for about 1s. When dealing with the fault point, technicians usually use a multimeter to measure. A digital multimeter can only flash once for a short period of time within 1 second, and the maximum displayed data is about 170 V; the pointer of a pointer multimeter can only swing slightly in 1 second, and it only swings to about 120 V, making it impossible to conduct a detailed search for the fault point. On the other hand, the control circuit adopts a 380 V three-phase AC power supply, which may ignite during the troubleshooting process. Due to the fear of technicians, the troubleshooting is slow, time-consuming, labor-intensive, and safety is greatly compromised. Innovative research is conducted on the common problems currently existing, and targeted fault diagnosis devices and methods are proposed. [Method] Three 200W light bulbs are combined to form a bulb diagnostic device, sharing one grounding electrode, and the other polarity is connected to the A, B, and C three-phase power supply. The bulbs are connected by the instantaneous suction of the 1DQJ relay. If the light is on, it means that there is no fault in the circuit. If the light is off, it means that there is a fault. The method of finding faults using the A, B, and C three-phase power supply is explained in detail. [Result & Conclusion] The proposed fault point diagnosis device and method can accurately and quickly diagnose the fault point of the control circuit and greatly improve the safety in fault diagnosis.
Authors and Affiliations
Shaojie TANG, Kaize TANG, Lei GUO, Chen CUI
Impact and Control Measures of Subway Shield Tunnel Underpassing Ancient Buildings
[Objective] To clarify the impact of tunnel construction and operation in soft soil areas on ancient buildings, and formulate corresponding control plans, it is necessary to study the control of subway tunnel constructio...
Comparative Analysis of Calculated and Experimental Current Carrying Capacities of Rail Transit Aluminum Alloy Conductive Rails
Objective AAC (luminum alloy conductive) rails are widely used in rail transit power supply systems. However, a significant deviation often exists between the calculated and tested values of the permissible current carry...
Exploration of Urban Rail Transit Logistics Organization Models
Objective In order to make full use of the surplus capacity of urban rail transit and develop logistics services, with Shenzhen Metro as an example and based on the compatibility between urban distribution market and urb...
Full-Width Evacuation Door System for Urban Rail Transit Trains and Evacuation Simulation
[Objective] Due to the large passenger number in urban rail transit trains, in case of emergencies, it is necessary to evacuate passengers to a safe area within the shortest time using the optimal evacuation method. In t...
Optimization Design of Rest Facilities in the External Space of Guangzhou Metro Wushan Station Based on PSPL Survey
[Objective] In order to improve the quality of urban space, it is necessary to optimize the design of rest facilities in the external space of urban rail transit stations. [Method] The external space of Wushan Station o...