Feasibility Analysis of Availability Payment Scheme Implementation in Infrastructure Projects: Case Study of Trans Sumatera Toll Road Development Phase II

Journal Title: International Journal of Current Science Research and Review - Year 2025, Vol 8, Issue 05

Abstract

Toll road infrastructure development is a key strategy in improving connectivity and economic growth in Indonesia. The Trans Sumatra Toll Road Phase II, including the Betung – Tempino – Jambi section, is a national strategic project that uses the Availability Payment (AP) scheme. This scheme guarantees the toll road operator’s income based on predetermined service standards, regardless of traffic volume. This study aims to evaluate the financial feasibility of the Bayung Lencir – Tempino – Simpang Ness Toll Road project by comparing conventional and Availability Payment financing schemes. The analysis was conducted using financial indicators such as Net Present Value (NPV), Internal Rate of Return (IRR), Profitability Index (PI), Payback Period, and Discounted Payback Period. The results show that without the Availability Payment scheme, the project is not financially viable as it has a negative NPV and a lower IRR than the Weighted Average Cost of Capital (WACC). However, with the implementation of the Availability Payment scheme, the financial indicators show positive results, indicating that the project becomes feasible. These findings provide implications for the government in determining sustainable infrastructure project funding policies as well as for investors in assessing the feasibility of toll road project investments in Indonesia.

Authors and Affiliations

Swastika Wirabumi, Dr. Eka Pria Anas,

Keywords

Related Articles

Using Marketplace for MSMEs: A Look at Capability and Ecosystem Perspective

This article discusses the requirements for MSMEs to adapt to a marketplace. MSMEs must use the marketplace to increase their performance by reaching out to more significant markets. However, with limited resources, MSME...

The Development Strategy of Quail Farming Business in Pesantren Manajer Tholabie, Indonesia

Pesantren Manajer Tholabie is Islamic boarding schools in Indonesia that has business units in the field of animal husbandry, the business of quail farming. The quail farming business in boarding school is expected to ha...

Challenges and Strategies in the Return of Land Bailout Funds for Toll Road Construction: A Detailed Analysis of PT Hutama Karya's Approach

This study explores the factors that cause the delay in the process of returning the Land Bailout Fund (LBF) and examines potential problems related to the inability of the Government of Indonesia to return LBF to PT Hut...

The Puzzle of Mosaicism: Mechanisms and Clinical Implications in Preimplantation Genetic Testing

Chromosomal mosaicism in preimplantation embryos, characterized by cells with varying genotypes, arises due to mitotic errors after fertilization. These errors, including anaphase lag, mitotic nondisjunction, or cytokine...

Evaluation of Prevention of Patients at Risk of Falls in Nurses in Inpatient Department: A Qualitative Case Study

Patient safety is an essential component of quality health services. However, patient care still has shortcomings, especially in patient safety incidents such as patients being injured due to falls. This study aimed to e...

Download PDF file
  • EP ID EP766418
  • DOI 10.47191/ijcsrr/V8-i5-27
  • Views 15
  • Downloads 0

How To Cite

Swastika Wirabumi, Dr. Eka Pria Anas, (2025). Feasibility Analysis of Availability Payment Scheme Implementation in Infrastructure Projects: Case Study of Trans Sumatera Toll Road Development Phase II. International Journal of Current Science Research and Review, 8(05), -. https://www.europub.co.uk/articles/-A-766418