Finances Associated with Implementation of Condition Monitoring System and Its Payback Duration

Abstract

Most manufacturers are facing a push on cost due to few factors. These tough times on our economy plus global recession has cornered the manufacturers in either reducing the quality of product or in some cases reduction in some services. The impact of this is highly observed in markets like ours where we already have to face cost deviations and sudden cost jumps in industrial utilities such as, (gas, electricity, oil) and even the availability at times is hard to maintain which increases cycle time, down time thus inducing extra labor cost and co-related increases, so in order to compete internationally we need to use advanced systems which reduces costs rather than cutting back on things. Condition based monitoring have achieved greater acceptance over the years but the actual returns and payback is not understood clearly which puts the idea and adoptability at doubts this research work has marked the importance of understanding need, benefits and payback of the implementation cost of condition-based monitoring system including buying the equipment Vibxpert 2. This work is based in manufacturing organization and after calculating all the costs which were incurred in implementing conditionbased monitoring. It was found that in 5 years and 2 months the cost of implementing condition-based monitoring will be paid off.

Authors and Affiliations

Engr. Sajid Nawaz Khan

Keywords

Related Articles

Paper Materials for Furniture: A Design Review

This paper discusses the paper waste can be the alternative materials for furniture to replace the wood and metal materials. Furniture is an important product that occupies indoor and outdoor spaces that used for sitting...

Strategies for Considerations Requirement Sample Size in Different Clinical Trials

Usually the main problem face any investigation it how to determent a sample size, however, some considerations required in sample size to conduct the efficacy and make realistic well-researched before began study. This...

Performance Analysis of DC Micro Grid with PV-Fuel Cell Hybrid Generation

Conventional energy resources are being replaced by Renewable energy sources mainly due to increasing environmental concerns. Photovoltaic (PV) and Fuel cell (FC) are suitable to be used in modern DC microgrids due to th...

Changes and concussion in the global labor force (A brief look on the Israeli labor)

Many economies in the world are undergoing changes as a result of the shocks caused by globalization in the local labor force. These changes must answer orderly government, and as the national mechanism will "wake up" Ea...

Disproof of the Riemann Conjecture with Infinity and the Points beyond the Critical Strip and X axis Zeroes Still Existing beyond the Critical Strip Besides the historical Proofs Discussion of the Zeta Function and Dirichlet Function beyond the Riemann Conjecture and Riemann’s Article Title of Prime Numbers Less than a Given Magnitude

We perhaps have been following the wrong path in looking at the Riemann conjecture by forgetting the article title. Riemann wanted us, as he makes clear in his title, to talk about and discuss “On the Number of Primes Le...

Download PDF file
  • EP ID EP647493
  • DOI -
  • Views 122
  • Downloads 0

How To Cite

Engr. Sajid Nawaz Khan (2019). Finances Associated with Implementation of Condition Monitoring System and Its Payback Duration. International Journal of Modern Research In Engineering & Management., 2(4), 1-6. https://www.europub.co.uk/articles/-A-647493