Impact Analysis of New Shield Tunnel Under-passing Construction on Existing Railways
Journal Title: Urban Mass Transit - Year 2024, Vol 27, Issue 12
Abstract
[Objective] The construction of new shield tunnels under-passing existing railway can cause deformation of the former railway subgrade. To ensure the stability and safety of the existing railway, appropriate reinforcement measures must be adopted. [Method] The Shanghai Airport Connection Line under-passing Lijiatang-Shenzhuang Railway project is analyzed as a study case, which adopts a reinforcement scheme involving ′portal isolation piles+ground grouting′. Numerical simulation results and on-site monitoring data are used to assess the impact of shield tunnel under-passing construction on the existing railway, and to evaluate the effectiveness of the ′portal isolation piles+ground grouting′ reinforcement scheme. [Result & Conclusion] The shield tunnel under-passing construction may cause significant settlement of the existing railway subgrade, while the ′portal isolation piles+ground grouting′ reinforcement scheme effectively controls the above-mentioned railway subgrade deformation. According to numerical simulation results, the maximum settlement of existing railway subgrade decreases by 67% after reinforcement, and the convergence deformation on tunnel upper part decreases by approximately 41%. All deformations are within the limits specified by the relevant standards. On-site measurements confirm that the cumulative deformation of existing railway track and subgrade caused by the shield construction meets the regulatory requirements. However, due to the impact of shield tunneling, larger deformation fluctuations are observed in existing railway subgrade and track on one side of the shield tunneling.
Authors and Affiliations
Fei XIAO
Test and Verification Scheme for Interconnected/Intercommunicated Flexible Formation Vehicles in Beijing Rail Transit
[Objective] In order to achieve flexible train formation function under the conditions of interconnected lines, a systematic vehicle test and verification scheme is proposed. [Method] Taken the interconnection and fl...
Aerodynamic Characteristics of City Railway Train at the Sudden Variable Tunnel Cross-Section Positions
[Objective] In order to ensure train operation safety and passenger comfort, it is necessary to study the chang-ing laws of aerodynamic force and pressure inside the city railway train when passing through the variable...
Unstuck Technology for EPB/TBM Dual Mode Shield Machine Stuck in Rock Stratum
[Objective] During the tunneling process of the EPB (earth pressure balance shield machine)/TBM (full-face hard rock tunnel boring machine) dual-mode shield tunneling machine, problems such as excessive wear of the cut...
Active Selection Control Scheme for Dual Pantographs Based on TCMS
[Objective] Pantograph malfunctions can result in the loss of train traction capability, significantly impacting the normal operation of train. To address uneven carbon slide wear of two pantographs on the same vehicle o...
Research on Urban Rail Transit Service Quality Evaluation Based on Passenger Demand
Objective Evaluation of urban rail transit service quality based on passenger demand not only promotes service quality improvement and enhances passenger satisfaction with travel, but also contributes to economic and soc...