Influence Analysis of Newly-built Channel Foundation Pit Under-passing High-Speed Railway Bridge on Adjacent Piers

Journal Title: Urban Mass Transit - Year 2024, Vol 27, Issue 3

Abstract

[Objective] When a new channel foundation pit under-passes a high-speed railway bridge, the excavation and unloading of the foundation pit will cause the displacement of the soil surrounding the bridge, and further affect the high-speed railway bridge. In order to ensure the operation safety of the high-speed railway line, it is necessary to analyze the influence of the foundation pit under-passing the bridge on the adjacent piers. [Method] With the project of the new channel foundation pit of Beijing-Hangzhou Grand Canal under-passing the Shanghai-Kunming High-speed Railway bridge as the background, based on finite element simulation and on-site measurement, the influence of foundation pit construction on the existing high-speed railway piers is analyzed. The feasibility and effect of the scheme adopting multiple rows of bored piles+inclined brace reinforcement for the foundation pit construction are evaluated. [Result & Conclusion] As the channel foundation pit construction causes horizontal displacement of the high-speed railway piers along the bridge, it is proposed to take proper measures to increase the stiffness along the bridge. The closer the bored pile is to the high-speed railway pier, the larger the horizontal displacement. With the construction of the channel foundation pit, the horizontal displacement of the bored pile shows the trend of increasing first and then decreasing. The displacement of piers under the reinforcement scheme of multiple rows of bored piles + inclined brace is less than the 2mm limit required by the relevant standard, meeting the requirements for train operation safety.

Authors and Affiliations

Xiaolong LI

Keywords

Related Articles

Reflection on the Circle Line and Express Line in Shanghai Urban Rail Transit Network Planning

[Objective] Since the implementation of the Shanghai Master Plan (2017-2035), with the development of five new Shanghai towns (Jiading, Qingpu, Songjiang, Fengxian, and Nanhui) and the Yangtze River Delta integration a...

Intelligent Health Management System for Rail Transit Signaling System Power Supply

Objective The dual-bus and dual-interruptible power supply (UPS) architecture in rail transit signaling system power supply enhances the system redundancy but does not effectively reduce component failure rates. To impro...

Intelligent Management-control Method and Platform Application for Rail Transit EPC Projects

Objective Targeting the technical challenges including difficult implementation of refined management, lagged progress control information, heavy safety supervision tasks, and difficulties in achieving digital handover i...

Research on Traction Power Supply System for Shanghai Rail Transit Chongming Line

[Objective] It is to address issues such as stray current corrosion and limited distance for DC traction power supply systems conventionally using rail return in urban rail transit. [Method] After conducting a comparativ...

Selection and Heat Dissipation Analysis of Regenerative Braking Energy Absorption Device in Urban Rail Transit Depot

[Objective] The regenerative braking energy absorption resistance in urban rail transit depot has a large heat dissipation. In order to effectively solve the problem, it is necessary to select the right type of regenerat...

Download PDF file
  • EP ID EP732808
  • DOI 10.16037/j.1007-869x.2024.03.034
  • Views 83
  • Downloads 0

How To Cite

Xiaolong LI (2024). Influence Analysis of Newly-built Channel Foundation Pit Under-passing High-Speed Railway Bridge on Adjacent Piers. Urban Mass Transit, 27(3), -. https://www.europub.co.uk/articles/-A-732808