Integrated Multi-objective Optimization of Predictive Maintenance and Production Scheduling: Perspective from Lead Time Constraints

Journal Title: Journal of Intelligent Management Decision - Year 2022, Vol 1, Issue 1

Abstract

For the integrated optimization of job-shop production scheduling and predictive maintenance, this paper fully considers such constraints as product delivery time and changing machine failure rate, and establishes a multi-objective optimization model aiming to minimize the processing cost and the product processing time. The model includes the changing machine failure rate into the integrated optimization of job-shop production scheduling and predictive maintenance, and enables the prediction of the machine state according to the processing time of the current job, laying the basis for the decision-making of the machine activity and the reasonable and effective production planning. In addition, the non-dominated sorting genetic algorithm (NSGA)-II was designed to solve the proposed model. The algorithm performance was improved through the operator crossover and mutation by the simulated binary crossover algorithm (SBX). The proposed strategy was verified through a case study.

Authors and Affiliations

Zhiyuan Zhao, Qilong Yuan

Keywords

Related Articles

Relationship Between International Trade and Logistics: An Evaluation on Countries of Shanghai Pact and the Belt and Road Initiative

Although some of the resources required to meet human needs can be provided by a country, the rest must be supplied from other countries because not every country has all resources. Therefore, the demand for internationa...

High-Performance Carbon Cycle Supply Data Sharing Method Based on Blockchain Multichain Technology

In the evolution of blockchain technology, the traditional single-chain structure has faced significant challenges, including low throughput, high latency, and limited scalability. This paper focuses on leveraging multic...

Optimization of the Trust Propagation on Supply Chain Network Based on Blockchain Plus

The decentralization of blockchain technology greatly improves the trust relationship in the supply chain network. In view of the lack of trust, uncertainty, and asymmetry in the supply chain network, this paper integrat...

Gamification in the Workplace: Enhancing Employee Engagement Through Gameful Experiences

In an era characterized by intense labor market competition for skilled and motivated personnel, the adoption of innovative strategies, such as gamification, has emerged as a critical factor for cultivating an engaging w...

Optimising the Efficiency of Municipal Utility Vehicle Fleets Using DEA-CRITIC-MARCOS: A Sustainable Waste Management Approach

The efficiency of utility vehicle fleets in municipal waste management plays a crucial role in enhancing the sustainability and effectiveness of non-hazardous waste disposal systems. This research investigates the operat...

Download PDF file
  • EP ID EP752338
  • DOI https://doi.org/10.56578/jimd010108
  • Views 28
  • Downloads 0

How To Cite

Zhiyuan Zhao, Qilong Yuan (2022). Integrated Multi-objective Optimization of Predictive Maintenance and Production Scheduling: Perspective from Lead Time Constraints. Journal of Intelligent Management Decision, 1(1), -. https://www.europub.co.uk/articles/-A-752338