INVESTIGATION OF CONSTRUCTIONS OF THE UNDERGROUND HYDROTECHNICAL TUNNEL OF TEREBILRITSKAYA HPP AND ADJACENT MOUNTAINOUS MASSES USING THE RADIO WAVE METHOD
Journal Title: Нові технології в будівництві - Year 2018, Vol 34, Issue
Abstract
The research institute of construction production made geophysical works in order to identify the weakened soil zones adjacent to the body of the TerebleRitskaya HPS tunnel, Khust district of the Zakarpattia region. Geophysical works were performed by the method of radio waves sounding in the institute using the experimental pattern of the constructoroscope of the dipole inductive SII K5. Based on the received geometric and geophysical data, it is possible to perform a calculation of hollow volumes to evaluate the filling efficiency of the injection theirs method in order to increase the tunnel strength and reliability of its operation.
Authors and Affiliations
П. Е. Григоровский, А. М. Куделя, Н. П. Чуканова, Е. В. Мурасева
INVESTIGATION OF CONSTRUCTIONS OF THE UNDERGROUND HYDROTECHNICAL TUNNEL OF TEREBILRITSKAYA HPP AND ADJACENT MOUNTAINOUS MASSES USING THE RADIO WAVE METHOD
The research institute of construction production made geophysical works in order to identify the weakened soil zones adjacent to the body of the TerebleRitskaya HPS tunnel, Khust district of the Zakarpattia region. Ge...
RESEARCH OF THE LAWS OF STRUCTURE FORMATION IN THE TECHNOLOGY OF DISPERSE CONSTRUCTION MATERIALS
It is known that construction composite materials (mortars and concretes based on mineral ororganic cements, slips for making ceramics, coating compositions and many other such dispersions) may be approached as selforg...
RESEARCH ON THE IMPACT OF TECHNOLOGICAL PARAMETERS INJECTION HYDRAULIC INSULATION IN THE ZONE OF DISTRIBUTION
The article is devoted to studies of the influence of technological parameters of injection the technology of the device of the waterproofing system to the intensity of the zone change strangeness Are the results of the...
MODERN APPROACHES TO THE PRELIMINARY ASSESSMENT OF INVESTMENT BUILDING PROJECTS WITH THE STOCHASTICITY OF PROCESSES
The works devoted to the issues of preliminary assessment of investment and construction projects are analyzed. The analysis of the specifics of the development and implementation of investment and construction projects...
TECHNOLOGY DEVELOPMENT CONTINUOUS ANTIFILTRATION SCREEN
The technology of the device of a continuous antifiltration screen under existing buildings and structures, which are located in areas subject to flooding, has been developed. The use of well boring under slope and the...