Kebolehpercayaan & Kesahan Soal Selidik Kelewatan dalam Projek Pembinaan Menggunakan Model Pengukuran Rasch (Reliability & Validity of the Construction Delay Questionaire using the Rasch Mesurement Model)

Journal Title: Jurnal Kejuruteraan - Year 2017, Vol 29, Issue 1

Abstract

Construction industry is one of the industry that generates economy and at the same time provides job vacancy and national treasure. However, delay in construction project is a global phenomenon which occurred at almost every country, thus retards the development of the country. There are numerous of studies on construction delay using questionnaire done by researchers worldwide. Reliability and validity of the questionnaire should be reviewed in advance to ensure the effectiveness of the survey conducted. It is to obtain the appropriate data and the data can be used for futher analysing. The objective of this research is to get the reliability and validity of the questionnaire on construction delays projects using the Rasch measurement model. For purposes of data analysis, this research uses Winstep a software-based Rasch Modal measurement. Beside Cronbach alpha reliability, Rasch Measurement Model can provide the reliability of the item and respondent. Validity of data evaluated from various aspects, including the items and the respondent misfit, principal component analysis and rating scale. A total of 54 of the 64 items were identified contributed to delays in construction projects in Malaysia.

Authors and Affiliations

Muhamad Azry Khoiry, Noraini Hamzah, Wan Hamidon Wan Badaruzzaman, Norngainy Mohd Tawil

Keywords

Related Articles

Cities Insane

Globally, cities are known to be the engines of development. Meanwhile, the failure of most Nigerian cities to satisfy the needs of city dwellers has increasingly become an issue of discourse in recent times. These inade...

Adaptive Cancellation of Localised Environmental Noise

Noise cancellation systems are useful in applications such as speech and speaker recognition systems where the effects of environmental noise have to be taken into considerations. A robust method for the cancellation of...

Optimising Cutinase Enzyme Recovery in Thermo-Induced Phase Separation of LS54/DX ATPS by Enhanced Volume Exclusion Effect

Low recovery of cutinase enzyme in water-enriched phase after thermo-induced separation stage of LS54/Dx aqueous two-phase system was improved by enhanced volume exclusion effect in the polymer-water extraction system. I...

Pengawasan Beban Tak Mengganggu Menggunakan Mesin Penyokong Vektor (Nonintrusive Load Monitoring Using Support Vector Machine)

Kertas kerja ini membentangkan pembangunan pengawasan beban tak mengganggu (PBTM) untuk mengenal pasti beban dengan menggunakan pengelasan mesin penyokong vektor berbilang (MPVB). Suatu kaedah pengawasan beban diselia di...

Development of Bicycle Shift Models in Universiti Kebangsaan Malaysia Campus

Cycling is suitable for short trips and take shorter commute time for students who are living in the campus. Moreover, it requires lower costs and can reduce environmental pollution. However, cycling in campus is not wel...

Download PDF file
  • EP ID EP417477
  • DOI 10.17576/jkukm-2017-29(1)-03
  • Views 163
  • Downloads 0

How To Cite

Muhamad Azry Khoiry, Noraini Hamzah, Wan Hamidon Wan Badaruzzaman, Norngainy Mohd Tawil (2017). Kebolehpercayaan & Kesahan Soal Selidik Kelewatan dalam Projek Pembinaan Menggunakan Model Pengukuran Rasch (Reliability & Validity of the Construction Delay Questionaire using the Rasch Mesurement Model). Jurnal Kejuruteraan, 29(1), 13-21. https://www.europub.co.uk/articles/-A-417477