FACTORS AFFECTING REWORK IN CONSTRUCTION PROJECT

Abstract

 The importance of the construction industry is not limited to the different measures of economic development alone, slumps or upsurges in its activities, have a high multiplier effects on almost every phase in the social and economic structure of the nation. It has been concluded that the high cost of house ownership in India and other housing problems of the lower income groups are results of the defect in the construction industry. “There is no gainsaying that the twin problem of cost and time overruns may not yet be over as they still characterize construction projects in most parts of the world especially in developing countries like India”. Cost and time overruns are common occurrences in the construction industry and these have continued unabated.

Authors and Affiliations

S. Muralidharan

Keywords

Related Articles

SIMULATION OF EXACT MAXIMUM POWER POINT TRACKING OF PARTIALLY SHADED PV STRING USING CURRENT EQUALIZATION THEORY

Maximum power point tracking (MPPT) algorithms are among the most important research topic related to photovoltaic (PV) system. Conventio nal MPPT method give effective results and easy to...

 A PAPER ON A COMPARATIVE STUDY BLOCK TRUNCATING CODING, WAVELET, FRACTAL IMAGE COMPRESSION & EMBEDDED ZERO TREE

 Many different image compression techniques currently exist for the compression of different types of images. Image compression is fundamental to the efficient and cost-effective use of digital imaging technology a...

 Numerical Study of Back Propagation Learning Algorithms for Forecasting Water Quality Index

 Artificial intelligence techniques, such as neural networks are modeling tools that can be applied to predict water quality parameters. Artificial neural networks are frequently used to model various highly variab...

 Effects of Adding Alcohols, Electrolytes and Carboxyl Methyl Cellulose (CMC) on Design Parameters in Internal Loop Airlift Bubble Column

 The effect of gas velocity, liquid-phase properties, solid-particle concentration and the static liquid height on gas hold-up (ɛg) and mass transfer coefficient (KLa) were studied in a three phase internal loop ai...

 Image Super Resolution Enhancement using IBP Method

 This proposed paper provide Adaptive Iterative pixel (IBP) method for image super-resolution (SR). This paper presents a novel self-learning approach for SR. This proposed framework can provide Iterative Pixel, wh...

Download PDF file
  • EP ID EP122864
  • DOI -
  • Views 63
  • Downloads 0

How To Cite

S. Muralidharan (0).  FACTORS AFFECTING REWORK IN CONSTRUCTION PROJECT. International Journal of Engineering Sciences & Research Technology, 5(1), 578-584. https://www.europub.co.uk/articles/-A-122864