INTEGRATED BIM AND DES FRAMEWORK FOR EFFECTIVE TIME AND COST MANAGEMENT OF SLIPFORM OPERATIONS
Journal Title: International Journal of Engineering Sciences & Research Technology - Year 0, Vol 4, Issue 9
Abstract
Effective management of Slipforming operations is critical due to operation’s linearity that is considered a source of planning and proper cost management complications. This paper is presented to assist practitioners and researchers for automating the process of generation both time schedules and costs estimates simultaneously for Slipform projects by developing an Integrated BIM- based and DES software and framework. The BIM Schedule and Cost integrated (BSCI) framework reinforces both BIM and DES capabilities, enhanced by BIMs extracted information the quantities are used to generate DES input data in order to calculate the execution times for construction processes and exchange data through various software. Proposed research framework consists of: 1) Slipform BIM model that exports material quantity take-offs, schedules and required resources to an external database, 2) Discrete Event Simulation model encountering complete specification of the interdependencies between activities and resources and 3) Intelligent model that automatically collects, transfers and reserve data among various software programs. Furthermore, to illustrate the software’s functionality a preliminary prototype was developed for a Slipform case of study and validation of the software was conducted for evaluation purposes that showed robust results of 98% for Schedule generation and 96% for cost estimates.
Authors and Affiliations
Hesham A. Khalek*
Review of Study and Design of Coding and Interleaving in a MIMO-OFDM Communication System
This paper, presents of the review performance analysis of four different channel coding and interleaving schemes for MIMO-OFDM communications systems. A comparison is done based on the BER, hardware implementati...
EFFECTOF CONSTRUCTION EQUIPMENT ON PRODUCTION IN BUILDING COSTRUCTION PROJECT
The contractor’s equipment policy and equipment management system have a great impact on the profitability of a firm, especially for contractors with large investment in equipment. The cost of equipment in civil engi...
SCIENCE MENTORING PROGRAM AS IMPLEMENTED IN THE DEPARTMENT OF EDUCATION LEYTE DISTRICT, LEYTE DIVISION, PHILIPPINES
The study generally aimed to determine the impact of science mentoring program as implemented in the DepEd Leyte District, Leyte Division. A total of 20 teacher-mentees from the different mentored schools were cho...
A REVIEW ON CLASSIFICATION OF EEG SIGNAL DATA
A Brain computing system is a communication channel between the human or animal brain and external environment; it’s a collaboration in which brain controls a mechanical device as a natural part of its representat...
SOME PROPERTIES AND THEOREM ON FUZZY SUB-TRIDENT DISTANCE
This paper introduces some simple properties and theorem based on Fuzzy Sub-Trident Distance along with the help of Trapezoidal Fuzzy Numbers. The results are discussed with suitable numerical example.