OPTIMIZATION OF MULTI CONTRUCTION PROJECT IMPLEMENTATION WITH LIMITED HUMAN RESOURCE, TIME, AND CAPITAL USING THE RESOURCE LEVELING METHOD

Journal Title: Engineering and Technology Journal - Year 2023, Vol 8, Issue 09

Abstract

The quality and quantity of the number of projects that can be done in units of time into their own selling points for construction service companies in order to continue to compete in the industry. The limitations of human resources, time, and capital are often the problems experienced by companies to meet ever-increasing client demands. This situation needs to be evaluated further. The evaluation of the construction of several construction projects in time can be done by Critical Part Method (CPM) approach to analyze the critical path of a project, Project Evaluation Review Technique (PERT) to know the porsentation of the same project work if done in the future, and Resource Leveling for human resource allocation to avoid recruitment and retraining of workers. Based on research with CPM method, it is found that critical activity is a reference activity that should not be delayed, by using PERT, it can be concluded that some of the allocation and acceleration options of the project can be done based on Z table, and with Resource Leveling, the result of improvement of worker efficiency. This research uses CPM and PERT algorithm to see the allocation of work for multi level and resource leveling as field reference. Effectiveness and efficiency of company performance obtained result of efficiency improvement equal to 24,95% for worker payment and 33,35% for acceleration of project development according to result of research.

Authors and Affiliations

Imama Sodikin ,  Slamet Hani  ,   Joko Susetyo  ,Arif Fadhilah ,

Keywords

Related Articles

Thermal and Mechanical Properties of Two Sensible Energy Storage Materials (Firebrick)

The thermal and mechanical properties of two sensible energy storage materials (Firebrick) were investigated. The properties examined were compressive strength, bulk density, porosity and thermal conductivity. The compre...

ESTIMATE PRIMARY IMPACTS ON THE ENVIRONMENT DURING THE CONSTRUCTION OF THE TUNNEL ZENICA ON THE CORRODOR VC

During the execution of works on the construction of the tunnel Zenica, there is a certain number of activities that can cause negative consequences for the environment. In this regard, the greatest danger is represented...

COMPARISON OF MODIFIED D-H NOTATION WITH STANDARD D-H FOR AND ALL OF DIRECT KINEMATICS OF INDUSTRIAL ROBOTIC MANIPULATORS

SUMMARY: The accelerated growth of technology has allowed the development of more complex electromechanical structures and specific to the industry demand. Robots have emerged to meet this demand. The main objective of t...

ERODIBILITY INDICES UNDER DIFFERENT LAND USES IN AWKA, NIGERIA

Erosion problems are on the increase, worldwide, especially in the Southeastern part of Nigeria, where this problem is becoming uncontrollable. In this study, erodibility indices were studied in Nnamdi Azikiwe University...

FAULT TOLERANT ALGORITHM TO COPE WITH TOPOLOGY CHANGES DUE TO POSTURAL MOBILITY

The research involving in providing healthcare services to remote patients have led to the exploration of new solutions to provide effective Quality of Service (QoS) and fault tolerant network for Wireless Body Area Netw...

Download PDF file
  • EP ID EP721084
  • DOI 10.47191/etj/v8i9.09
  • Views 50
  • Downloads 0

How To Cite

Imama Sodikin ,  Slamet Hani  ,    Joko Susetyo , Arif Fadhilah , (2023). OPTIMIZATION OF MULTI CONTRUCTION PROJECT IMPLEMENTATION WITH LIMITED HUMAN RESOURCE, TIME, AND CAPITAL USING THE RESOURCE LEVELING METHOD. Engineering and Technology Journal, 8(09), -. https://www.europub.co.uk/articles/-A-721084