Quality Control for The Maintenance Organization in Clark Pampanga for Line Maintenance
Journal Title: Engineering and Technology Journal - Year 2021, Vol 6, Issue 5
Abstract
Unscheduled maintenance happens where an unknown problem occurs that is not in the schedule of tasks to be performed by a mechanic unlike scheduled maintenance, line maintenance is done every landing and before take-off of the aircraft and in some cases due to technical and mechanical problem observed and detected during line maintenance cancellation of flight is implemented and a declaration of AOG “Aircraft on Ground” meaning the aircraft will be grounded until the time that the aircraft can meet the standards of airworthiness.
Authors and Affiliations
Chan, Mark Anthony A , Tiglao Nebuchadnezzar N. , Manzon, Rick Donald , Bolisay, Bebot
INTEGRATION STRATEGY FOR KAMBANG AND TANGKAHAN FISH LANDING BASES
The Kambang Fish Landing Base is a Type D port (with a service capacity of 2,000 tonnes per year).The fish production of PPI Kambang is the highest in Pesisir Selatan Regency with an existing fishing potential of 1038.15...
The Temperature-Dependent XAFS Debye-Waller Factor of Molybdenum Metal Calculated using Anharmonic Correlated Einstein Model
Temperature-dependent X-ray absorption fine structure (XAFS) Debye-Waller (DW) factor of molybdenum (Mo) metal has been studied under the influence of thermal disorders. This factor is calculated in simple and explicit f...
Early Hotspot Detection in Photovoltaic Modules using Deep Learning Methods
Photovoltaic (PV) energy systems have been widely used in energy production especially in recent years due to their clean, reliable, environmentally friendly and resource continuity. The electrical energy to be obtained...
DESIGN AND SIMULATION OF SHELL-AND-TUBE HEAT EXCHANGER (STHE) WITH THE EFFECT OF BAFFLES USING CFD-TOOL
In the current scenario, heat exchangers are used in the thermal system to maintain the working liquid's temperature. Due to their robust design and performance characteristics, the Shell and Tube Heat Exchangers (STHE)...
REACTIVATION AND FUNCTIONAL SHIFT OF SUSPENDED WELLS FOR INJECTION TO INCREASE OIL RECOVERY IN WATERFLOODING PROJECT PLANS
The "BDS" oil field volumetrically has Original Oil in Place (OOIP) of 56.84 MMSTB. This field has produced 20.45 MMSTB with a current recovery factor (RF) value of 35.89%. Because the remaining reserves are still large,...