Remaining Life Assessment of Kotabaru 2x7 MW Coal Fired Power Plant Circulating Water A252 Gr 2 Intake Pipe by Inspection Method

Journal Title: International Journal of Current Science Research and Review - Year 2024, Vol 7, Issue 05

Abstract

Kotabaru power plant is a power plant that was built in 2010 and currently the construction work is pending. The construction work stopped in 2014 and based on Kotabaru power plant construction final quantity report, Kotabaru construction work progress is 79,61% up to now. Kotabaru power plant uses open cooling system and takes seawater as cooling water resources. The seawater distribute through intake pipeline which use A252 grade 2 material 600 mm and 800 mm diameter pipeline with 3PL coating and rubber lining inside the pipe. The pipeline distribute the water in 3.184.739 kg/hr flow rate and 5 kg/cm2 G pressure. These pipeline material was on site in 2013 and it was not constructed yet. In 2022 Kotabaru power plant is planned to continue the construction work progress. It was about 9 years of pipeline material on Kotabaru power plant site and these pipeline is exposed to the environment such as sunlight, temperature, oxygen, water, and contaminants and cause a primer failure, especially ultraviolet light (UV) from the sunlight is the main damaging factor. Ultraviolet light from sunlight is high enough to break the coating of pipeline. Inspection and assess the pipeline can help the management to figure out pipeline actual condition. More effective inspections can reduce the risk level by reducing the frequency of future failures, through corrective and preventive action. In general, the purpose of this method is classify all risk level equipment, calculate the risk value of all equipment and it can help to make a decision to the next construction period. The service lifetime of pipeline prediction can be determined by actual pipe condition by use corrosion test and actual thickness dimension of the pipeline. This method will inform the life time prediction of the pipeline that should be meet the 15 years life time required and also inform the risk matrix value of all pipeline equipment on the site.

Authors and Affiliations

Hafidz Nufi Hartanto , Agus Suprihanto, Gunawan Dwi Haryadi,

Keywords

Related Articles

Business Strategy for Geonusa in Facing Price Competition in Geospatial Information System Industry

In an increasingly competitive market, Geonusa, a geospatial service provider in Indonesia, faces challenges from price-sensitive competitors and low barriers to entry. This paper explores strategies to position Geonusa...

Teaching Process for Modules in the Information Technology Major for Higher Students According to the Competency Approach

The first part of the article studies the concept of “competency” and approaches to competency, setting goals and output standards of the teaching process. The main part of the article focuses on analyzing the teaching p...

The Significance of Stakeholders in the Rooftop Solar Power Plant Ecosystem Industry in Indonesia

Stakeholder analysis in an ecosystem is important for managers to planning the most efficient strategic steps for their organization. On the other hand, there is lack of research that mapping the significance of actors i...

Food Hygiene and Sanitary Condition Awareness among Street Food Vendors

The objective of this study was to investigate the level of awareness among the street food vendors in Barangay Saber, Marawi City specifically regarding food hygiene and sanitary condition. The researcher utilized a des...

Audit Quality Evidence from Indonesia: A Systematic Literature Review

The audit quality produced by the auditor can be a benchmark in their work. This research aims to uncover factors influencing audit quality, especially in Indonesia. Articles were obtained using Google Scholar, and the p...

Download PDF file
  • EP ID EP735600
  • DOI 10.47191/ijcsrr/V7-i5-60
  • Views 42
  • Downloads 1

How To Cite

Hafidz Nufi Hartanto, Agus Suprihanto, Gunawan Dwi Haryadi, (2024). Remaining Life Assessment of Kotabaru 2x7 MW Coal Fired Power Plant Circulating Water A252 Gr 2 Intake Pipe by Inspection Method. International Journal of Current Science Research and Review, 7(05), -. https://www.europub.co.uk/articles/-A-735600