Abstract
[Objective] When railway 10 kV/0.4 kV indoor substations and signal rooms are constructed at the same location, electrical equipment and signal equipment arranged too far apart will waste land resources, while placing them too close may cause electromagnetic compatibility issues. Thus, it is necessary to study the safe distance between the two. [Method] Through electromagnetic environment simulations and field tests, the distribution of power frequency electromagnetic fields in 10 kV substations is understood. Simulations are conducted following the GB/T 17626.8—2006 Electromagnetic compatibility-Testing and measurement techniques-Power frequency magnetic field immunity test and GB/T 24338.5—2018 Railway applications-Electromagnetic compatibility-Part 4: Emission and immunity of the signaling and telecommunications apparatus standards, calculating magnetic field intensity for both exposed transformer busbars and those enclosed in steel plate housings. The results are compared with the magnetic field limit values specified for sensitive equipment in above standards. In field tests, the electromagnetic field intensity generated during normal operation and short-term faults of electrical equipment in the substation is measured. [Result & Conclusion] The indoor magnetic field intensity is related to the relative distance from the electrical equipment. At 1 m from the electrical equipment, the electric field intensity is significantly below 4 kV/m, and the magnetic field intensity is below 30 A/m. The minimum safe distances between electrical and signaling equipment are determined to be 0.96 m for exposed equipment and 0.28 m for enclosed equipment in steel plate housings.
Authors and Affiliations
Qi LEI, Wei XIONG, Chunhua FANG, Jinhao WANG
Analysis of Cracking Causes at Grounding Terminals of Bogie Axle-end and Resolution Measures
[Objective] Due to continuous changes in the operating conditions of metro lines, abnormal vibrations between wheel and rail s occasionally occur, leading to fractures in the suspension components at the bogie axle-end a...
Data-driven Prediction Method for High-speed Railway EMU Train Front and Rear Car Wheel Tread Defects
Objective Tread defects are a primary manifestation of wheel failures in high-speed railway EMU (electrical multiple unites) trains, significantly impacting both EMU train operation safety and passenger ride comfort. Whe...
DC Bias in Transformers of Dual Current Power Supply Lines
[Objective] To ensure the safety of traction transformers in dual current power supply lines and prevent issues such as transformer vibration and winding temperature increase caused by excessive DC bias current, which...
Research on Switch Machine Fault Prediction Based on CHMM
Objective As an important component of urban rail transit signal equipment, once the switch machine malfunctions, the operation will be seriously affected. Monitoring and predicting its health status is particularly impo...
Construction Technology for Ultra-wide Excavation near Existing Buildings in Metro Station Shield Tunneling Receiving Area
Objective It is aimed to address the difficulty in settlement control of existing ground buildings during ultra-large section excavation beneath them in metro station construction. Method Based on the shield tunneling re...