slugAnalysis of Improper Material Management Affecting Cost in Construction Projects

Abstract

The paper aims to fill a void created by the absence of proper materials management on construction sites. Research has shown that construction materials accounts for 50-60% of the total cost in construction projects. For a productive and cost efficiency, material management is very essential. Material mismanagement decrease the contractor’s profit leading to huge losses, and leaving the project in big troubles, therefore the proper management of this single largest component can improve the productivity and cost efficiency of a project and help ensure its timely completion. The existing construction material management practices of contracting companies are investigated in this paper. The study was exclusively assessed through questionnaire survey, interviews, field visits and discussion with the concerned authorities. 26 factors were selected for the proper assessment of most critical factors. The factors are ranked according to the degree of significance as assessed by the respondents. The results obtained from the ranking factors shows that the top five major’s causes of cost overruns are: design issues, market condition, store issues, contractor issues and external issues. Recommendations are given for reducing the material mismanagement in the construction industry.

Authors and Affiliations

P. Lenin, L. Krishnaraj, D. Narendra Prasad, V. R Prasath Kumar

Keywords

Related Articles

Gaurav Kumar, Prof. Durgesh Wadbude

We propose a novel compression scheme for digital images using chrominance channels with feature descriptor and Discrete Cosine Transform (DCT). The feature descriptor of chrominance channel is based on their error metr...

Matrix Converter Technology for Wind Energy Conversion Systems

In recent years, wind energy has become one of the most important and promising sources of renewable energy, which demands additional transmission capacity and better means of maintaining system reliability. The evoluti...

Low Power Cam Gain High Speed with Parity Bit and Power Gated Ml Sensing Technique

Content addressable memory (CAM) it compares input search data against a table of stored data and returns the address of matching data. It have a single clock cycle throughput and make them faster than other hardware, s...

Performance Evaluation of Wideband Semiconductor Optical Amplifier

In this paper, we investigate and evaluate the Semiconductor Optical Amplifier (SOA) performance as a function of the intrinsic and extrinsic parameters. We build a model in the optisystem ( tool )than set the intrinsic...

Copy Cat: Effective Identification and Removal of Copy Cat Nodes in WSN

In this system, wireless sensor networks are more vulnerable to the node clone, and several distributed protocols have been proposed to detect this attack. So they require too strong assumptions that are to be practical...

Download PDF file
  • EP ID EP18162
  • DOI -
  • Views 302
  • Downloads 10

How To Cite

P. Lenin, L. Krishnaraj, D. Narendra Prasad, V. R Prasath Kumar (2014). slugAnalysis of Improper Material Management Affecting Cost in Construction Projects. International Journal for Research in Applied Science and Engineering Technology (IJRASET), 2(5), -. https://www.europub.co.uk/articles/-A-18162