Study on influence of construction sequence of Pile-Beam-Arch station pilot tunnels on surface settlement

Journal Title: Urban Mass Transit - Year 2024, Vol 27, Issue 6

Abstract

Objective During construction of PBA(pile-beam-arch) method stations, land subsidence is greatly affected by the guiding hole excavation sequence. In order to effectively control land subsidence, it is necessary to study the influence law of the guiding hole construction sequence. Method Based on the engineering background of Tiancun Station, a three-dimensional guiding hole construction model for the tunnel of 3-pillar 4-span PBA method station is established, and a reasonable guiding hole excavation sequence is obtained. Based on the above result, in order to shorten the construction period, a staggered synchronous excavation method for the guiding hole construction is proposed, and its effect on land subsidence control is studied based on the on-site measured data. Result & Conclusion The land subsidence is smaller when the lower layer guiding hole is excavated first. When the guiding holes are close to each other, simultaneous excavation will produce group hole effect. In order to effectively control land subsidence in actual construction,separate excavation or staggered excavation should be used.The staggered synchronous excavation method for guiding hole construction has a good effect on land subsidence control,and significantly shortens the construction period. The above method can provide a reference for the similar large-span tunnel station construction.

Authors and Affiliations

Saihong HU

Keywords

Related Articles

Constitutive Model and Experimental Study of Stud Steel-Shotcrete Interface Bond-Slip in Mining Method Tunnel Initial Support

Objective It is aimed to elucidate the constitutive relationship of bond-slip at the interface between stud steel and shotcrete in the initial support of mining method tunnel. Method Four different working conditions are...

Integration Research on Next Generation Comprehensive Monitoring System for Urban Underground Infrastructure Operation

Objective The development of urban underground space in China is showing a trend towards diversification, depth, and complexity, making it challenging to diagnose and decision-making on causative factors through multi-di...

Analysis and Solutions for Pantograph-Catenary Abnormal Wears

[Objective] Severe abnormal wear of PC (pantograph-catenary) systems can lead to the breakage of contact wires and the collapse of the overhead network, directly causing power supply interruptions and potentially trigg...

Application of Maximum Generalized Rayleigh Entropy in Diagnosing Train Air-conditioning Refrigerant Charge

Objective In diagnosing train air-conditioning refrigerant charge using machine learning methods, numerous features often appear, posing a dilemma in feature selection for diagnosis. Excessive feature selection leads to...

Prediction and Analysis of Earth Pressure Balance Shield Machine Advancing Speed in Limestone Stratum

Objective The advancing speed of shield machine is crucial not only for the tunnel excavation pace but also for the predicting construction schedule and cost. Therefore, it is necessary to predict and analyze the advanci...

Download PDF file
  • EP ID EP737759
  • DOI 10.16037/j.1007-869x.2024.06.030
  • Views 54
  • Downloads 0

How To Cite

Saihong HU (2024). Study on influence of construction sequence of Pile-Beam-Arch station pilot tunnels on surface settlement. Urban Mass Transit, 27(6), -. https://www.europub.co.uk/articles/-A-737759