The Rank of Risk Factors Affecting Time Delay and Cost Overrun of Building Constructions Projects in Yangon

Abstract

In Yangon City, Myanmar, most of the building construction projects fail to meet their cost and time constraints, which will lead to low return on investment. The purpose of this paper is to understand risk management of building construction and the study area is Yangon. This study illustrates that how to manage risks in building construction to become a successful project with best possible outcome by reducing risks that delay the project. The study was conducted through a questionnaire survey administered to 39 construction projects and 148 professionals in Yangon for finding risk rating and prioritization of risk. Risk prioritization was done by Technique for Order of Preference by Similarity to Ideal Solution TOPSIS . Khin Su Yi | Kyaw Kyaw "The Rank of Risk Factors Affecting Time Delay and Cost Overrun of Building Constructions Projects in Yangon" Published in International Journal of Trend in Scientific Research and Development (ijtsrd), ISSN: 2456-6470, Volume-4 | Issue-4 , June 2020, URL: https://www.ijtsrd.com/papers/ijtsrd31557.pdf

Authors and Affiliations

Khin Su Yi | Kyaw Kyaw

Keywords

Related Articles

Teachers' Knowledge, Understanding, Ability and Implementation of Competency Based Approach in the Teaching of Geography in Secondary Grammar Schools in the South West Region of Cameroon

This paper was designed to assess whether the adoption of Competence Based Approach CBA to improve the quality of secondary education in Cameroon is a dream or reality. Resistance to change and reluctance to implement na...

A Review Study on Seismic Behavior of Tall Structure by using Floating Columns with Shear Wall

Floating column rest on the beam, means the beam which support the column is act as a foundation. That beam is called as transfer beam. This is widely used in high storied buildings which are used for both commercial and...

The Relationship between Microfinance Institutions and Group Lending Model in Uttar Pradesh, India

Microfinance is a mechanism for the development of the country with especially focusing on poor women in rural areas. Micro Finance has had several successful initiatives, including the range of outreach, as well as the...

Technical Workshops in English Speaking Technical Secondary Schools and the Impact on Students' Academic Performance in Public Examinations

This study focuses on technical workshops and teacher quality in english speaking technical secondary schools and the impact on students' academic performance in public examinations. A descriptive survey research design...

Women Participation in Community and Social Development Project (CSDP) in Ondo State, Nigeria

The study examined women participation in Community and Social Development Project CSDP in Ondo State, Nigeria. The data obtained from 120 women were analyzed using frequency counts, percentage, mean as well as Pearson P...

Download PDF file
  • EP ID EP686581
  • DOI -
  • Views 144
  • Downloads 0

How To Cite

Khin Su Yi (2020). The Rank of Risk Factors Affecting Time Delay and Cost Overrun of Building Constructions Projects in Yangon. International Journal of Trend in Scientific Research and Development, 4(4), -. https://www.europub.co.uk/articles/-A-686581