Positioning System for Burst Pipe Points in Metro Interval Fire Hydrant Systems
Journal Title: Urban Mass Transit - Year 2025, Vol 28, Issue 3
Abstract
[Objective] When water leakage accidents like pipe bursts occur in the fire hydrant system of metro intervals, the train control room will directly close the electric valves on the main pipeline remotely, cutting off water supply to the entire interval fire hydrant system. This results in significant safety risks for operations. Therefore, it is necessary to study a positioning system for burst pipe points in metro interval fire hydrant systems. [Method] A solution is proposed to install electromagnetic flowmeters and electric contact pressure gauges on interval fire protection risers to enable precise positioning of burst pipe points. Additionally, through linkage with the BAS (building automation system) for environmental and equipment monitoring, electric valves before and after the pipe burst point can be closed remotely and swiftly, minimizing the impact on the interval fire protection system. The overall architecture of the positioning system for burst pipe points in metro intervals is outlined, comprising three layers: perception layer, network layer, and application layer. [Result & Conclusion] A rapid positioning system for burst pipe points is established, enabling the remote closure of valves before and after the burst point location. This approach could minimize unprotected sections of the fire hydrant system and the metro service downtime, ensuring the metro interval resumes normal operations promptly following accidents such as pipe burst.
Authors and Affiliations
Zhengzhong WU, Wenju YU, Junping LIU, Ke LI, Zongzhou LIU, Junxia CHANG, Chao LIU, Junjie TONG, Kecheng YU
Calculation Method of Tunnel Over-Under Excavation Based on Point Cloud Data
[Objective] During tunnel construction using the drilling and blasting method, over-excavation and under-excavation issues are always unavoidable. To accurately identify over-under excavation positions and calculate the...
Planning Scheme of Shenzhen Airport East Comprehensive Transportation Hub for Air-Rail Intermodal Integration
Objective In recent years, China actively promotes the development of air-rail intermodal transportation. However, as a complex system with aviation and high-speed rail two major external transportation modes meeting, th...
Dynamic Response Simulation of the Pile-soil Composite Foundation and Adjacent Metro Tunnel under High-speed Train Load
Objective As a typical vibration load, the vibration load caused by high-speed train running will induce dynamic response of the pile-soil foundation and the adjacent structures. It is necessary to study the characterist...
Research on Smooth Tracking and Control of Stair-like Target Speed with Compatible On-Board System in Urban Rail Transit
[Objective] In view of the special phenomenon that the target speed message period is longer than the on-board control period and the message interval is not fixed in urban rail transit compatible on-board system, a dual...
Optimization of Grouting Reinforcement Mass Parameters for Shield Under-passing Buildings in Sandy Stratum
Objective Grouting reinforcement is a common measure to reduce disturbance on existing buildings during tunnel construction. It is essential to focus on the design of GRM (grouting reinforcement mass) parameters in the e...