Abstract

[Objective] Shanghai is one of the first batch of cities in China launching urban rail transit systems. In recent years, Shanghai has initiated renovation projects for existing rail lines, undertaking many pioneering explorations and practices. It is necessary to summarize and reflect on the relevant experience to develop methods and approaches for existing line renovation,so as to serve as a reference for future projects. [Method] The background and types of existing line renovation projects in Shanghai are outlined. Practices of existing line renovation without suspending operations and partially suspending operations are introduced. Additionally, the temporal-spatial characteristics of historically implemented partial suspension renovation projects in Shanghai are statistically analyzed. [Result & Conclusion] The non-suspension construction is a fundamental principle for existing line renovation both domestically and internationally. This construction method has advantages in terms of construction duration, quality, and investment, and is particularly suitable for specific scenarios, such as civil engineering renovations involving track areas. Methods such as delayed starts and early closures, retaining trains on the mainline to extend night-time construction windows, and the use of prefabrication, modular design, and process simulation techniques can improve construction efficiency during night-time windows. Measures such as suspending operations during periods of low passenger flow, arranging shuttle buses as alternative transportation, skipping stations under renovation, and establishing mature operational mechanisms can mitigate the impact of partially suspending renovations on passenger travel.

Authors and Affiliations

Sitao WANG, Zhenbo WANG, Jianwei YAO

Keywords

Related Articles

Influence of Metro Shield Left/Right Line Tunnel Parallel Under-passing on the Defor-mation and Stress of Existing Open-cut Highway Tunnel under Deformation Joint Working Condition

Objective To ensure the successful implementation of metro shield tunnel parallel under-passing through the existing open-cut highway tunnel project under deformation joint condition, it is necessary to analyze the defor...

Virtual Formation Train Tracking Control Strategy Based on Sliding Mode Control

Objective In existing train control systems based on moving blocking, there is a significant safety margin between adjacent trains. This leads to a mismatch between the transportation efficiency of a segment and its actu...

Construction Mechanical Characteristics of Shallow Karst Stratum Cavity and Subway Tunnel under Different Position Relationships

[Objective] The relationship between the cavity and the newly built tunnel is complex, and the cavity in the surrounding rock of the subway tunnel can affect the construction inside the tunnel and the safety of the gro...

Redundant Speed and Distance Measuring System at Train Head and End Based on CAN Bus

Objective Data interconnection and interaction are realized through ATP (automatic train protection) system in most of the existing train speed and distance measuring technologies. However, the implementation process is...

Key Technologies of Vehicle Base Station Design for Suspended Monorail Transit

[Objective] The overall plane layout of the suspended monorail transit vehicle base directly affects train′s operation and engineering cost. The turnout type selection has a great influence on the overall layout of the d...

Download PDF file
  • EP ID EP766696
  • DOI 10.16037/j.1007-869x.2025.05.018
  • Views 20
  • Downloads 0

How To Cite

Sitao WANG, Zhenbo WANG, Jianwei YAO (2025). Practice and Reflection on Renovation of Shanghai Urban Rail Transit Existing Lines. Urban Mass Transit, 28(5), -. https://www.europub.co.uk/articles/-A-766696